Removal of additional clean fill (13ton).
Allowance
$750
这个有两个,院子和车道各收一次,合理吗?
还有我准备把种树的取消,以后自己种。
Supply and install plant as shown on the plan. Plants to be watered and fertilised upon completion.
$1,130
这个草坪一定要他们来吗,自己铺呢?
Supply and lay Sir Walter Buffalo Turf to front and rear yards as shown on the plan. All turf will be laid on 100mm turf underlay. All turf will be fertilised, watered and rolled on completion of laying.
走道铺设鹅卵石呢,这个活值得不值得让他们做?
Supply and install Nepean pebbles to path as shown on plan.
FENCING,GATES我觉得可以自己来吧,大家觉得呢?
衣架肯定自己来了。