今天Metricon给了一个粗略的报价,原来basic price为27万的房型(38sq),最后初步报价涨到37万。其中有一点不解的是:增加的10万元中有4万元是申请建房许可,埋水电煤气管线等等。我觉得这一块太多了,有没有有经验的朋友说一说?
Site Works
3. Site Works - Allowance $40,000.00
[SS-SIT-CON-035]
Allowance only for all site related works including waffle pod slab construction, connection of
underground power, water supply, stormwater drains, sewerage system, gas supply, fall of land,
temporary fencing and termite protection (where required) over the building area.
Extra Description All to future details - underground pit by owner
|